| Ground Fault Circuit Interrupter (GFCI) | 1 | Active | SB6100-100-0 is an Industrial Shock Block® with a supply voltage of 240 and trip level (mA) at 20 (fixed). |
| Ground Fault Circuit Interrupter (GFCI) | 1 | Active | SB6100-110-0 is an Industrial Shock Block® with a supply voltage of 240 and trip level (mA) at 6, 10-100 in increments of 10 (selectable). |
| Circuit Protection | 1 | Active | SB6100-300-0 is an Industrial Shock Block® with a supply voltage of 600 and trip level (mA) at 20 (fixed). |
| Circuit Protection | 1 | Active | SB6100-311-0 is an Industrial Shock Block® with a supply voltage of 600 and trip level (mA) at 6, 10-100 in increments of 10 (selectable). |
| Transient Voltage Suppressors (TVS) | 1 | Active | Avalanche breakdown diodes fabricated in a proprietary silicon avalanche technology protect each I/O pin to provide a high level of protection for electronic equipment that may experience destructive electrostatic discharges (ESD). These robust diodes can safely absorb repetitive ESD strikes at ±30kV (contact and air discharge, IEC 61000- 4-2) without performance degradation. Additionally, each diode can safely dissipate 80A (SC1105) of 8/20μs surge current (IEC 61000-4-5 2nd edition) with very low clamping voltages. |
| Transient Voltage Suppressors (TVS) | 1 | Active | |
SC3120AS.S. CONTROL 3 CHANNEL CHASER | Industrial Automation and Controls | 1 | Active | The SC3/SC4 Series are solid-state 3 or 4 channel, chasers designed for sequential three or four circuit flashing of incandescent lamp loads. Unlike electromechanical chasers, there are no contacts to arc, wear, and eventually fail. Fixed or adjustable rates of 30 to 300 operations per minute. Operation Sequential 3 or 4 circuit flashing of incandescent loads with equal time delays for each load. Upon application of input voltage, Load 1 is energized. At the end of the time delay, Load 1 de-energizes and Load 2 energizes. At the end of the time delay, Load 2 de-energizes and Load 3 energizes. This cycle continues until input voltage is removed. The set time delay (rate) is the timing for the whole cycle, for all 3 or 4 loads (output contacts).Reset: Removing input voltage resets the unit and cycle. |
SC4120AS.S. CONTROL 4 CHANNEL CHASER | Time Delay Relays | 1 | Active | The SC3/SC4 Series are solid-state 3 or 4 channel, chasers designed for sequential three or four circuit flashing of incandescent lamp loads. Unlike electromechanical chasers, there are no contacts to arc, wear, and eventually fail. Fixed or adjustable rates of 30 to 300 operations per minute. Operation Sequential 3 or 4 circuit flashing of incandescent loads with equal time delays for each load. Upon application of input voltage, Load 1 is energized. At the end of the time delay, Load 1 de-energizes and Load 2 energizes. At the end of the time delay, Load 2 de-energizes and Load 3 energizes. This cycle continues until input voltage is removed. The set time delay (rate) is the timing for the whole cycle, for all 3 or 4 loads (output contacts).Reset: Removing input voltage resets the unit and cycle. |
| Monitors | 1 | Active | The SCR series are Tower and Obstruction Lighting Controls used in a variety of applications. The SCR430T and SCR630T are universal lamp alarm relays designed to sense the failure of flashing or steady incandescent beacon lamps or steady side lights. The SCR9L is a universal lamp alarm relay designed to sense the failure of flashing or steady LED beacon lamps or obstruction lamps. The SCR490D Series is used to provide remote monitoring of steady burning incandescent marker and obstruction lighting. Four onboard switches allow operator programming for lighting systems with two through nine lamps on a single AC circuit. See the Technical Resource Section below for individual datasheets containing specifications and operation details. |
| Industrial Automation and Controls | 1 | Active | |