Zenode.ai Logo
Alpha

Analysis Toolkit

Pick a report. Put in your parts, add your program's inputs, and let Zenode's Agent build the deliverable — with sources you can review in one click.

NASA-STD-8739.10 §8.2.6

Worst Case Analysis

Every parameter bounded over temperature, radiation and mission life. One row per parameter with the worst-case band, the terms behind it, and the datasheet table each came from — terms that cannot be closed stay MISSING.

Run it

DMSMS · Second source

Find Alternates

Drop-in and functional replacements for one prime part, compared datasheet to datasheet: specs, pinout, package, price, stock and lifecycle, each signal cited. Scope it to an approved parts list or require pin-for-pin.

Run it
Coming soon

NASA-STD-8739.10 §8.2.6 · EEE-INST-002

Derating Analysis

Applied worst-case stress checked against the program derating limits for every part. Per-end-item table, exceedance summary, and a list of parts with unresolved ratings, each limit cited to its source.

Coming soon

NASA-STD-8739.10 §8.2.5.1

As-Designed EEE Parts List

The eight required fields per part: equipment, description, part number, specification, generic part number, qualification method and status, approval status, and manufacturers. Enriched from the catalog and maintained as the design changes.

Coming soon

NASA-STD-8739.10 §8.2.7.4

As-Built EEE Parts List

Per end item and serial number: catalog columns pre-filled from the design list, traveler columns (serials, lot date codes, reference designators, CAGE codes) captured from receiving through an intake template.

Coming soon

NASA-STD-8739.10 §8.1.6 · SAE AS5553

Counterfeit Control Plan

The five required processes, with the parts-availability section generated from lifecycle and sourcing data for your BOM and the procurement and reporting sections drafted from your supplier records.

Coming soon

NASA-STD-8739.10 · J-STD-001ES

Lead-Free Control Plan

Screens the BOM for pure-tin and other whisker-prone lead finishes and lays out the mitigation for each, per the J-STD-001ES space addendum, with the finish evidence cited per part.

Coming soon

NASA-STD-8739.10

Red Plague Control Plan

Identifies silver-plated copper wire and cable in the design and documents the controls against cuprous-oxide corrosion. A mechanical BOM screen with the wire attributes cited.

Coming soon

NASA-STD-8739.10 · RHAP

Radiation Hardness Assurance Plan

Mission environment, radiation design margin, and the part-by-part evidence table: TID, SEE, and ELDRS data where published, the COTS posture where it is not, and the test-plan gaps called out.

Coming soon

NASA-STD-8739.10 §8.1

EEE Parts Management and Control Plan

The master plan the other deliverables hang from: assurance level, tailoring, parts control board, and the satellite plans. Program prose stays yours; the rule sections and part-data appendices are generated.

Coming soon

NASA-STD-8739.10 · DMSMS

Obsolescence Analysis

Lifecycle status per part with end-of-life and last-time-buy signals, plus drop-in alternates for anything at risk. Kept current as manufacturer notices arrive.

Coming soon

NASA-STD-8739.10 · NSPAR

Waivers and NSPAR Packages

Board-ready evidence for a non-standard or non-compliant part: the exceedance or gap, the datasheet and qualification evidence, and the qualified alternates considered, ready for the parts control board.