
ADS8331 Series
2.7V-to-5.5V 16-Bit 500kSPS Low-Power Serial Analog-to-Digital Converter (ADC)
Manufacturer: Texas Instruments
Catalog
2.7V-to-5.5V 16-Bit 500kSPS Low-Power Serial Analog-to-Digital Converter (ADC)
Key Features
• Low-Power, Flexible Supply Range:2.7-V to 5.5-V Analog Supply8.7 mW (250 kSPS in Auto-NAP Mode,VA = 2.7 V, VBD = 1.65 V)14.2 mW (500 kSPS, VA = 2.7 V,VBD = 1.65 V)Up to 500-kSPS Sampling RateExcellent DC Performance:±1.2 LSB Typical, ±2 LSB Maximum INL at2.7 V±0.6 LSB Typical, –1/1.5 LSB Maximum DNLat 2.7 V16-Bit NMC Over TemperatureExcellent AC Performance at 5 V, fIN= 1 kHz:91.5-dB SNR, 101-dB SFDR, –100-dB THDFlexible Analog Input Arrangement:On-Chip 4-/8-Channel Mux With BreakoutAuto/Manual Channel Select and TriggerOther Hardware Features:On-Chip Conversion Clock (CCLK)Software/Hardware ResetProgrammable Status/Polarity EOC/INTDaisy-Chain ModeGlobalCONVST(Independent ofCS)Deep, Nap, and Auto-NAP Powerdown ModesSPI™/DSP Compatible Serial InterfaceSeparate I/O Supply: 1.65 V to VASCLK up to 40 MHz (VA = VBD = 5 V)24-Pin 4-mm × 4-mm VQFN and 24-Pin TSSOPPackagesLow-Power, Flexible Supply Range:2.7-V to 5.5-V Analog Supply8.7 mW (250 kSPS in Auto-NAP Mode,VA = 2.7 V, VBD = 1.65 V)14.2 mW (500 kSPS, VA = 2.7 V,VBD = 1.65 V)Up to 500-kSPS Sampling RateExcellent DC Performance:±1.2 LSB Typical, ±2 LSB Maximum INL at2.7 V±0.6 LSB Typical, –1/1.5 LSB Maximum DNLat 2.7 V16-Bit NMC Over TemperatureExcellent AC Performance at 5 V, fIN= 1 kHz:91.5-dB SNR, 101-dB SFDR, –100-dB THDFlexible Analog Input Arrangement:On-Chip 4-/8-Channel Mux With BreakoutAuto/Manual Channel Select and TriggerOther Hardware Features:On-Chip Conversion Clock (CCLK)Software/Hardware ResetProgrammable Status/Polarity EOC/INTDaisy-Chain ModeGlobalCONVST(Independent ofCS)Deep, Nap, and Auto-NAP Powerdown ModesSPI™/DSP Compatible Serial InterfaceSeparate I/O Supply: 1.65 V to VASCLK up to 40 MHz (VA = VBD = 5 V)24-Pin 4-mm × 4-mm VQFN and 24-Pin TSSOPPackages
Description
AI
The ADS8331 is a low-power, 16-bit, 500-k samples-per-second (SPS) analog-to-digital converter (ADC) with a unipolar, 4-to-1 multiplexer (mux) input. The device includes a 16-bit capacitor-based successive approximation register (SAR) ADC with inherent sample and hold.
The ADS8332 is based on the same core and includes a unipolar 8-to-1 input mux. Both devices offer a high-speed, wide-voltage serial interface and are capable of daisy-chain operation when multiple converters are used.
These converters are available in 24-pin, 4 × 4 QFN and 24-pin TSSOP packages and are fully specified for operation over the industrial –40°C to 85°C temperature range.
The ADS8331 is a low-power, 16-bit, 500-k samples-per-second (SPS) analog-to-digital converter (ADC) with a unipolar, 4-to-1 multiplexer (mux) input. The device includes a 16-bit capacitor-based successive approximation register (SAR) ADC with inherent sample and hold.
The ADS8332 is based on the same core and includes a unipolar 8-to-1 input mux. Both devices offer a high-speed, wide-voltage serial interface and are capable of daisy-chain operation when multiple converters are used.
These converters are available in 24-pin, 4 × 4 QFN and 24-pin TSSOP packages and are fully specified for operation over the industrial –40°C to 85°C temperature range.